<< Click to Display Table of Contents >> Navigation: 8REPORTS AT THE ENTITY LEVEL > 8.1 Risk Reports > 8.1.3 Risk Weakness Report |
This report again uses all risks, this time it shows the make-up of the Entity’s “Control Gap” with the items listed in order of the size of the gap each risk contributes to the whole. For example, in the report shown below the “Control Gap” is 2,534 (1,940-1,048), the first risk listed (60) contributes 198 (or 16.70%) to this gap: